Sourcing & Verification
Blueprint string reproduced byte-for-byte from community submission #121 on sandustryvault.com and published verbatim. We have not re-tested it in our own save. Footprint, power draw and throughput are not published by the source, so we do not state them.
Design Intent & Problem Solved
Built for Left -> Right workflow and designed for Wet Sand. Adjustable for Right <- Left or even funnel inputs. Either adjust if not sorting input or wet sand before running. Should be zero clog. Expandable to burn residue, transport burnt residue, and filter out gold.
Layout Render from the Original Submission
Layout Evidence & In-Game Captures
Machinery & Source Data
Machinery Types in the Payload
- Filter Wall
- Conveyor Right Mk 2
Community Adoption
- 122 in-game copies reported
- 4667 character string
Source Tags
- wetsand
- shaker
- anystage
- tileable
- thisispatrick
Reported Footprint & Power
- Footprint: not published by the source
- Power draw: not published by the source
Safe Placement & Cold-Start Checklist
- Place the module in open space with 2-block perimeter clearance before connecting production lines.
- Confirm research prerequisites, conveyor speed match, and liquid drop-pipe heights.
- Leave an inspection gap so any blocked Shaker or mineral slurry overflow can be drained safely.
- Verify power grid capacity satisfies the initial startup spike before feeding raw ore.
⚠️ Known Failure Modes & Anti-Clog Safeguards
Not reproduced in our own save yet, so no failure modes are confirmed here. Check the linked original submission for any notes from the author.