Single lane Sand->Liquid Gold Factory 9x67 tileable blueprint layout

Imported, not independently tested · Not stated by the source · Community submission

Single lane Sand->Liquid Gold Factory 9x67 tileable

A single lane processor full Sand to Florinal and Liquid Gold factory.

Sourcing & Verification

Blueprint string reproduced byte-for-byte from community submission #118 on sandustryvault.com and published verbatim. We have not re-tested it in our own save. Footprint, power draw and throughput are not published by the source, so we do not state them.

Design Intent & Problem Solved

A single lane processor full Sand to Florinal and Liquid Gold factory. Filters to prevent clogging Horizontally tileable Lava needs to be placed manualy in the thermal buffers and (4px recommended) in the 2 pockets in the lower left for steam generation and Dry Amethelis burning. Pumps lower right are for Florinol and Liquid Gold extraction. All the Liquid Vents need to be hooked up to mainline water supply.

Layout Render from the Original Submission

● Source layout render 6355 char string 14 machine types
Single lane Sand->Liquid Gold Factory 9x67 tileable layout render from the original community submission
Drag to pan · Scroll to zoom · Render published with the original submission on sandustryvault.com

Layout Evidence & In-Game Captures

Machinery & Source Data

Machinery Types in the Payload

  • Burner Belt Right
  • Filter Right Mk 2
  • Filter Wall Mk 2
  • Conveyor Right Mk 2
  • Thermal Relay
  • Heat Cannon Down
  • Thermofroster
  • Snowmaker
  • Conveyor Left Mk 2
  • Thermodryer
  • Clearing Frame Right
  • Smelter
  • Quantum Portal Exit
  • Quantum Portal

Community Adoption

  • 18 in-game copies reported
  • 6355 character string

Source Tags

  • sand
  • tileable
  • singlelane

Reported Footprint & Power

  • Footprint: not published by the source
  • Power draw: not published by the source

Safe Placement & Cold-Start Checklist

  1. Place the module in open space with 2-block perimeter clearance before connecting production lines.
  2. Confirm research prerequisites, conveyor speed match, and liquid drop-pipe heights.
  3. Leave an inspection gap so any blocked Shaker or mineral slurry overflow can be drained safely.
  4. Verify power grid capacity satisfies the initial startup spike before feeding raw ore.

⚠️ Known Failure Modes & Anti-Clog Safeguards

Not reproduced in our own save yet, so no failure modes are confirmed here. Check the linked original submission for any notes from the author.