Full Flow Sand to Florinol and Gold blueprint layout

Imported, not independently tested · Not stated by the source · Community submission

Full Flow Sand to Florinol and Gold

This is a small tilable factory.

Sourcing & Verification

Blueprint string reproduced byte-for-byte from community submission #130 on sandustryvault.com and published verbatim. We have not re-tested it in our own save. Footprint, power draw and throughput are not published by the source, so we do not state them.

Design Intent & Problem Solved

This is a small tilable factory. place lava to were the critter fences are, make the liquide storage contaners, place the sensor in the middle of the water, fill the lava, hook up the pipes, and you should be good to go. my favoriote part of this factory is that as far as I know it hasnt clogged in my experiance, and that it isnt stupid slow with only a few shakers.

Layout Render from the Original Submission

● Source layout render 8655 char string 21 machine types
Full Flow Sand to Florinol and Gold layout render from the original community submission
Drag to pan · Scroll to zoom · Render published with the original submission on sandustryvault.com

Layout Evidence & In-Game Captures

Machinery & Source Data

Machinery Types in the Payload

  • Conveyor Right Mk 2
  • Signal Gate
  • Filter Wall Mk 2
  • Quantum Portal Exit
  • Quantum Portal
  • Filter Right Mk 2
  • Launcher Up Mk 2
  • Launcher Right Mk 2
  • Thermal Relay
  • Heat Cannon Left
  • Thermodryer
  • Snowmaker
  • Thermofroster
  • Filter Left Mk 2
  • Burner Belt Left
  • Smelter
  • Signal Sensor
  • Filter Wall
  • Critter Fence
  • H
  • D

Community Adoption

  • 78 in-game copies reported
  • 8655 character string

Source Tags

  • farming
  • tileable
  • end game
  • mini
  • compact
  • no prefab
  • full factory
  • gold

Reported Footprint & Power

  • Footprint: not published by the source
  • Power draw: not published by the source

Safe Placement & Cold-Start Checklist

  1. Place the module in open space with 2-block perimeter clearance before connecting production lines.
  2. Confirm research prerequisites, conveyor speed match, and liquid drop-pipe heights.
  3. Leave an inspection gap so any blocked Shaker or mineral slurry overflow can be drained safely.
  4. Verify power grid capacity satisfies the initial startup spike before feeding raw ore.

⚠️ Known Failure Modes & Anti-Clog Safeguards

Not reproduced in our own save yet, so no failure modes are confirmed here. Check the linked original submission for any notes from the author.