Boiler vent blueprint layout

Imported, not independently tested · Not stated by the source · Community submission

Boiler vent

Basic setup to channel steam from your boiler & direct rain to your main pond

Sourcing & Verification

Blueprint string reproduced byte-for-byte from community submission #91 on sandustryvault.com and published verbatim. We have not re-tested it in our own save. Footprint, power draw and throughput are not published by the source, so we do not state them.

Design Intent & Problem Solved

Basic setup to channel steam from your boiler & direct rain to your main pond

Layout Render from the Original Submission

● Source layout render 343 char string machine list not published
Boiler vent layout render from the original community submission
Drag to pan · Scroll to zoom · Render published with the original submission on sandustryvault.com

Layout Evidence & In-Game Captures

Machinery & Source Data

Community Adoption

  • 123 in-game copies reported
  • 343 character string

Source Tags

  • steam
  • water
  • early game

Reported Footprint & Power

  • Footprint: not published by the source
  • Power draw: not published by the source

Safe Placement & Cold-Start Checklist

  1. Place the module in open space with 2-block perimeter clearance before connecting production lines.
  2. Confirm research prerequisites, conveyor speed match, and liquid drop-pipe heights.
  3. Leave an inspection gap so any blocked Shaker or mineral slurry overflow can be drained safely.
  4. Verify power grid capacity satisfies the initial startup spike before feeding raw ore.

⚠️ Known Failure Modes & Anti-Clog Safeguards

Not reproduced in our own save yet, so no failure modes are confirmed here. Check the linked original submission for any notes from the author.